RENOVATION

Work need to be done and estimated cost

A. Garbhagruha

  1. Stone foundation for bottom of garbhagruha   2800 CFT   3,36,000.00

B. Construction work for Karkala Stone

As shown in sketch (Including all material)
  1. Upa Peeta  74 RFT 88,800.00
  2. Paduka  69RFT 41,400.00
  3. Jagathi  67 RFT 67,000.00
  4. Kumuda  67 RFT 80,400.00
  5. Galapadi  65 RFT 78,000.00
  6. Meedika  63 RFT 75,600.00
  7. Prasada Bagilu(Door)-1  1 25,000.00
  8. Bottom of Gana Dwara  3 7,500.00
  9. Yeda Naali stone slab  128 SFT 32,000.00
  10. Sopana Mettilu sahita  1 55,000.00
  11. Soma Sutra  1 12,000.00
  12. Garbhagruha Paduka  37 RFT 22,200.00
  13. Slab for Garbhagudi (Singal Stone)  50 SFT 40,000.00
  14. Door for Garbhagruha  1 20,000.00
 Total 6, 44,900.00

C. Red stone (Murakallu) work on above foundation

  1. Prasad Goode (Wall) 380 SFT 95,000.00
  2. Bitthi Stambha 20 12,000.00
  3. Panjara 8 1,28,000.00
  4. Gana Dwara 3 48,000.00
 Total 3, 91,000.00

D. Walls for Garbhagruha

  1. Wall(Bottom)  361 SFT 90,250.00
  2. Alankara  L.S 20,000.00
  3. Karna Muchige  L.S 30,000.00
  4. Top Wall  167 SFT 43,420.00
  5. Bitthi Stambha  16 64,000.00
  6. Gana Dwara  3 36,000.00
  7. Uttara balaru kapotha alankara  L.S 20,000.00
 Total 3, 03,670.00
Toal Expenses for Stone (Shile Kallu), Red Stone (Mura Kallu) And Alankara  Total 16, 75,570.00

E. Wooden Works

  1. Wood required for upper roof Charu padi etc.  250 CFT 8,75,000.00
  2. Carpentry work for above (Majoori)  250 CFT 2,50,000.00
  3. Copper  450 KG 3,37,500.00
 Total 14, 62,500.00

F. Lower Roof

  1. Wood for lower roof work 350 CFT 12,25,000.00
  2. Carpentry work for above (Majoori)  350 CFT 3,50,000.00
  3. Copper  500 KG 3,75,000.00
 Total 19, 50,000.00

G. Teertha Mantapa

  1. Underground Stone foundation for Theertha Mantapa 1000 SFT 1, 20,000.00
  2. Construction work for Karkala Stone
  3. Mekala 51 RFT 61,200.00
  4. Paaduka  47 28,200.00
  5. Jagathi 46 46,000.00
  6. Kumudha 46 46,000.00
  7. Gala Padi 46 50,600.00
  8. Haasu Kallu(Slab) 100 SFT 25,000.00
  9. Kamba 4 1,40,000.00
  10. Bheem 4 50,000.00
  11. Karna Muchige LS 35,000.00
 Total 6, 02,000.00

H. Wood

  1. Wood for roof work 250 CFT 8,75,000.00
  2. Charge for wood (Carpentry)work 250 CFT 1,50,000.00
  3. Copper  450 KG 3,37,500.00
 Total 13, 62,500.00

Pouli

  1. East phase Pouli 860 CFT 12,90,000.00
  2. South phase Pouli 410 CFT 4,10,000.00
  3. West phase Pouli 390 KG 3,90,000.00
  4. North phase Pouli 410 KG 4,10,000.00
 Total 25, 00,000.00

Parivaara

(16 No, 1 Big Balikallu, Saptha Maatru,Nirmaalya Daari)
  1. Kshetra Paala L.S 3,00,000.00
  2. Interlock for innar angina 1600 SFT 1,04,000.00
  3. Vasantha Mantapa L.S 2,00,000.00
  4. Outer Madhilu  3,00,000.00
K. Theertha Kere(Pushkarini)  63,00,000.00
M. Water, Electricity, Boundry  23, 00,000.00
Estimated total amount  1, 90, 56,570.00
Including other expenses for temple renovation approximate   2, 00, 00,000.00